FAQCategory: ViewsHow are drawn two tasks assigned to the same resource?

How are drawn two tasks assigned to the same resource?

1 Answers

The top task is automatically scheduled and partially completed (indicated by the color change on the bar). The bottom task is manually scheduled. Both are scheduled at the same time to the same resource.