FAQCategory: ReportsHow to set risk level for a task?

How to set risk level for a task?

1 Answers

To set the risk level, insert the Risk column in the current table (if not already inserted) and assign the desired risk level by opening the dropdown menu inside the Risk cell.

Contact
Chat