What is Baseline1-10 Cost field?
1 Answers
The Baseline1 through Baseline10 Cost fields store the total planned cost for a task, a resource, or an assignment.
What is Baseline1-10 Cost field?
The Baseline1 through Baseline10 Cost fields store the total planned cost for a task, a resource, or an assignment.