A baseline saves nearly 20 pieces of information, including totals and time phased information for tasks, resources, and assignments. You can save 1 baseline. Baseline will essentially store 5 things: cost, work, duration, start date and finish date. The baseline is a copy of the Start, Finish, Work, and Cost for all the Resources, plus Duration for all the Tasks in your project. When you do a baseline you save the following data about the project at that specific point in time.
Question Link
You are able to Sign Out from Clouds. In order to do that, go to the File menu, select Open then select the desired cloud. In the file picker that appears, click Sign Out button from the upper left side of the dialog. If you want to sign in with a different account, first you must sign out and then sign in with the desired account.
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
Question Link
The “Bar” functionality allows you to format a bar individually. There are several characteristics you can change: the shape that appears at the start and the end of the bar; the shape, pattern, and color of the middle of the bar; the text that you can set in five locations around the bar (to the left or right of the bar, above, below, or inside it).
Question Link
To reinstall Project Plan 365 if bought from Microsoft Store, please download the application from there and activate the product.
To activate your subscription please follow the steps below:
1. Make sure you are Signed In in store with the same email address and password you used when you purchased the application.
2. Open Project Plan 365 app.
3. Go to menu Help - Subscriptions.
4. Press on Start Complete Editor Subscription button.
5. Wait for the confirmation message.
Question Link
For the moment, Project Plan 365 can be updated if you bought it from our website only from Download page.
Please follow the steps below in order to uninstall the Project Plan 365 from Microsoft Store:
1. Please go to Apps and Features dialog. The right panel will be populated with the list of preinstalled Windows 10 apps that you can remove.
2. Click on the Project Plan 365 app to see the options Move and Uninstall. Click on the Uninstall button to remove the application.
Question Link
Please download and install our latest version from our Download page. If you have bought a subscription from our website and inside the application it still states you are still in trial please Sign in with your email/password from the Project Plan 365 app (look upper right corner for sign in button).